
Tzora Data Center
Building Tomorrow's Infrastructure
With a strategic, central location between Jerusalem and Tel Aviv, our Tzora data center will be less than 30 minutes away from the two cities. Built underground with cutting-edge technology, our data center will offer 32 MVA, the highest allowed in Israel.
Our site will be built with the highest level of security and protection: from physical and cyber-attacks, from fire and water hazards.

2 underground floors
1 above-ground floor

Our Tzora data center has three floors:
each floor with 4,780 sqm.
SQUARE METERS
24,000
OF POWER
32 MVA
/ TIER IV
TIER III
Tzora data center will provide N+N redundancy across all systems, making interruptions almost impossible. State-of-the-art electrical equipment will offer maximum efficiency and reliability, and ensure 100% customer uptime. The electricity will be provided by Israel Electric Company.
power

Tzora data center will use a highly efficient 2N water-cooled chillers system with the support of MATAM Energy Center N+1 CRAH configuration.
cooling
.png)
The security of our data center is our highest priority. Using our multi-layered security as well as our on-site security team (present 24/7, every day of the year) will allow us to make sure that your digital assets are as safe as they can be. The data centers are protected with biometric readers and CCTV surveillance with a 60-day retention.
security

Anan designed its data centers with sustainability and environmental responsibility at the center of its reflection. In Tzora, data centers will be built using a high-efficiency design with a PUE of 1.4 and a hyper-efficient cooling system to limit our carbon footprints
sustainability
